Case Studies.

Our Case Study database tracks 8,303 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.

Filters
  • (2)
    • (2)
  • (2)
    • (2)
  • (1)
    • (1)
  • (2)
  • (2)
  • (2)
  • (2)
Selected Filters
2 case studies
Boeing Cuts Production Time by 25% with Skylight on Glass
Upskill
130 miles of wiring go into every new Boeing 747-8 Freighter, tucked away overhead and underfoot from the cockpit to the wheel wells.Every Boeing aircraft, from the workhorse 737 to the new 787 Dreamliner, has multiple configurations, each with its own wiring scheme. In past years, technicians used “phone books” full of diagrams to do their work. Even with laptops, the same basic problem arised: constant look-away interruptions as workers got directions and cross-checked diagrams and schematics.
Getting the Torque Just Right Could Save Millions for Aerospace Companies
Upskill
GE Aviation loses millions of dollars each year to errors made at key points during the assembly and overhaul of its engines. The costs show up in lost productivity, delays in testing, delays in customer deliveries, and the man-hours required to troubleshoot and correct faults. If errors arenʼt detected until after the engines are sent to customers, the repair costs exponentially increase.B-nuts are one such key manufacturing point. They play a critical role in aircraft engine fluid lines and hoses, providing a sturdy, reliable seal―but only if tightened and torqued properly. If not torqued properly, there will be a need for a maintenance do-over, cancelled flight, or even an in-flight shut down.

    Contact us

    Let's talk!

    * Required
    * Required
    * Required
    * Invalid email address
    By submitting this form, you agree that Asia Growth Partners may contact you with insights and marketing messaging.
    No thanks, I don't want to receive any marketing emails from Asia Growth Partners.
    Submit

    Thank you for your message!
    We will contact you soon.