下载PDF
Connected Field Services
技术
- 平台即服务 (PaaS) - 数据管理平台
适用行业
- 设备与机械
适用功能
- 现场服务
用例
- 机器状态监测
挑战
McKinley 在实施这些产品改进时面临几个挑战: - 哪种设备硬件最好? - 他们如何连接他们的产品并将它们放到网上? - 他们的产品将如何沟通? - 哪种传感器协议效果最好? - 他们将如何开发适当的可视化? - 我们如何将其与他们的现场服务技术集成? - 他们如何设置规则及其相关操作?
客户
麦金利电梯公司
关于客户
McKinley Elevator Corporation 是快速增长的住宅和商业无障碍产品市场的主要领导者。自 1948 年以来,麦金莱一直提供卓越的服务,并以提供最优质的产品而赢得声誉
解决方案
ThingLogix 首先帮助 McKinley 确定了适用于两种产品的嵌入式硬件和射频技术。将他们的产品载入 ThingWorx 平台,并将传入的数据集成到他们的 ServiceMax 组织中。设置基于优先级的事件和相关警报以及后续操作。与 PTC 合作开发用于实时监控的 ThingWorx 仪表板。
收集的数据
Asset Performance, Asset Status Tracking, Connectivity Status, Control System Alert, Service Lifecycle
运营影响
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.