下载PDF
Ford's Smart Charging Solution for EV Owners with Arcadia
技术
- 基础设施即服务 (IaaS) - 云数据库
- 传感器 - 电表
适用行业
- 零售
- 公用事业
服务
- 系统集成
挑战
福特是一家领先的汽车制造商,在开始销售电动汽车 (EV) 时面临着挑战。他们意识到,新的电动汽车车主需要经销商以外的支持,特别是在了解家庭充电体验方面。预计会出现诸如一天中电动汽车充电最便宜的时间等问题,福特希望帮助他们的驾驶员驾驭这种新体验。该公司现有电价数据库,但维护困难且不够全面。这导致福特寻求外部合作伙伴来提供必要的数据来实现新的充电功能。
关于客户
福特是一家全球知名的汽车制造商,以其广泛的车辆而闻名,其中包括电动汽车 (EV)。作为向客户提供全面支持的承诺的一部分,福特确定需要帮助新的电动汽车车主了解家庭充电流程。他们的目的是提供有关最具成本效益的车辆充电方式的信息,这需要访问全面且最新的电价数据库。福特的目标是通过启用可帮助驾驶员节省家庭充电费用的新功能来增强电动汽车拥有体验。
解决方案
福特选择 Arcadia 的 Signal API 作为应对挑战的解决方案。 Signal API 使福特能够访问世界上最全面的公用事业价格数据库,其中包含来自 2,000 多个公用事业公司和 16,000 个费率计划的信息。这涵盖了北美 95% 以上的可用价格。该 API 捕获每个费率组成部分、资费资格规则和费率选项,并支持统一消费费率、分层和分时 (TOU) 定价、系统和动态峰值、复杂的棘轮和复杂的计费规则。 Signal 维护当前的电力市场和每小时零售定价,包括每月 15,000 个电价更新。借助这一级别的数据,福特可以启用新功能,帮助驾驶员节省家庭充电费用。
运营影响
数量效益
相关案例.
Case Study
IoT Solutions for Smart City | Internet of Things Case Study
There were several challenges faced: It is challenging to build an appliance that can withstand a wide range of voltage fluctuations from as low at 90v to as high as 320v. Since the device would be installed in remote locations, its resilience was of paramount importance. The device would have to deal with poor network coverage and have the ability to store and re-transmit data if networks were not available, which is often the case in rural India. The device could store up to 30 days of data.
Case Study
Automation of the Oguz-Gabala-Baku water pipeline, Azerbaijan
The Oguz-Gabala-Baku water pipeline project dates back to plans from the 1970’s. Baku’s growth was historically driven by the booming oil industry and required the import of drinking water from outside of the city. Before the construction of the pipeline, some 60 percent of the city’s households received water for only a few hours daily. After completion of the project, 75 percent of the two million Baku residents are now served around the clock with potable water, based on World Health Organization (WHO) standards. The 262-kilometer pipeline requires no pumping station, but uses the altitude differences between the Caucasian mountains and the capital to supply 432,000 m³/d to the Ceyranbatan water reservoir. To the people of Baku, the pipeline is “the most important project not only in 2010, but of the last 20 years.”
Case Study
GPRS Mobile Network for Smart Metering
Around the world, the electricity supply industry is turning to ‘smart’ meters to lower costs, reduce emissions and improve the management of customer supplies. Smart meters collect detailed consumption information and using this feedback consumers can better understand their energy usage which in turn enables them to modify their consumption to save money and help to cut carbon emissions. A smart meter can be defined in many ways, but generally includes an element of two-way communication between the household meter and the utility provider to efficiently collect detailed energy usage data. Some implementations include consumer feedback beyond the energy bill to include online web data, SMS text messages or an information display in consumers’ premises. Providing a cost-effective, reliable communications mechanism is one of the most challenging aspects of a smart meter implementation. In New Zealand, the utilities have embraced smart metering and designed cost effective ways for it to be implemented. The New Zealand government has encouraged such a move to smart metering by ensuring the energy legislation is consistent with the delivery of benefits to the consumer while allowing innovation in this area. On the ground, AMS is a leader in the deployment of smart metering and associated services. Several of New Zealand’s energy retailers were looking for smart metering services for their residential and small business customers which will eventually account for over 500,000 meters when the multi-year national deployment program is concluded. To respond to these requirements, AMS needed to put together a solution that included data communications between each meter and the central data collection point and the solution proposed by Vodafone satisfied that requirement.
Case Study
NB-IoT connected smart meters to improve gas metering in Shenzhen
Shenzhen Gas has a large fleet of existing gas meters, which are installed in a variety of hard to reach locations, such as indoors and underground, meaning that existing communications networks have struggled to maintain connectivity with all meters. The meter success rate is low, data transmissions are so far unstable and power consumption is too high. Against this background, Shenzhen Gas, China Telecom, Huawei, and Goldcard have jointly trialed NB-IoT gas meters to try and solve some of the challenges that the industry faces with today’s smart gas meters.
Case Study
OneWireless Enabled Performance Guarantee Test
Tata Power's power generation equipment OEMs (M/s BHEL) is required to provide all of the instrumentation and measurement devices for conducting performance guarantee and performance evaluation tests. M/s BHEL faced a number of specific challenges in conducting PG tests: employing high-accuracy digital communications for instrumentation, shortening setup and dismantling time, reducing hardware required, making portable instrument setup, avoiding temporary cabling work and the material waste costs
Case Study
British Gas Modernizes its Operations with Innovative Smart Metering Deployment
The UK government has mandated that smart meters are rolled out as standard across Great Britain by end of 2020, and this roll-out is estimated to create £14 billion in net benefits to the UK in consumer energy savings and lower energy generation demand, according to the Oxford Economics report, “The Value of Smart Metering to Great Britain.” While smart-metering systems have been deployed in many countries, the roll-out in Great Britain is unique because it is led by energy retailers, who have responsibility for the Electricity and Gas meters. The decision to have a retailer-led roll out was made by DECC (Department of Energy and Climate Change) to improve customer experience and drive consumer benefits. It has also led to some unique system-level requirements to support the unique local regulatory model.