下载PDF
Kennards Hire making the job even easier for their customers thanks to industry-first Honeywell Scanning & Mobility solution
技术
- 功能应用 - 企业资源规划系统 (ERP)
- 自动化与控制 - 自动化与过程控制系统
适用行业
- 建筑与基础设施
- 设备与机械
适用功能
- 维护
- 质量保证
用例
- 资产跟踪
- 预测性维护
- 远程资产管理
服务
- 系统集成
- 软件设计与工程服务
挑战
Kennards Hire faced the challenge of providing their customers with easy access to information about the equipment they hire. The existing manual log book system for recording maintenance and service history was cumbersome and not accessible to customers. This lack of transparency made it difficult for customers to verify the service history and safety records of the equipment they were hiring. The company needed a solution that would empower customers with real-time access to this information, ensuring that they could confidently use the equipment knowing it had been properly maintained.
关于客户
Kennards Hire is one of Australia's largest and most respected hire companies, with over 150 branches and 1,100 employees across Australia and New Zealand. Founded in 1948 by Walter Kennard, the company has grown from a small store in Bathurst, NSW, to a major player in the equipment hire industry. Kennards Hire is known for its commitment to providing reliable, assured, and safe equipment for its customers. The company maintains a 'ready for hire' process to ensure that all equipment meets manufacturer guidelines and safety standards before being rented out. This customer-centric approach has helped Kennards Hire build a strong reputation and a loyal customer base.
解决方案
Kennards Hire collaborated with Honeywell Scanning & Mobility and Skywire to implement an automated technology solution across all its branches. The solution featured the Honeywell PF4i rugged industrial bar code printer, which played a crucial role in the 'ready for hire' process. Once the equipment passed all safety and maintenance checks, the system would automatically print a 'ready for hire' label. This label included a QR code that customers could scan with their mobile phones to access the service history, safety records, user guides, and training videos for the equipment. The information was made available through Kennards Hire's online plant portal, integrated with the ERP system, Baseplan Enterprise. This transformation from a manual to an automated system provided customers with a virtual window into the 'ready for hire' process, enhancing transparency and trust.
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.