下载PDF
Logistics Visibility Services
适用行业
- 设备与机械
适用功能
- 商业运营
服务
- 云规划/设计/实施服务
挑战
富士施乐面临几个挑战。分销商的交货查询必须手动与订单信息和集装箱提单文件相关联。由于富士施乐在估算仓储日期之前必须联系每个运输承运人以更新运输状态,因此对交货查询的响应缓慢且交货日期估计不准确。平均每月手动处理 1,800 个查询,给员工带来了过多的工作量。分销商已开始在称为“以防万一”的库存系统中确保额外库存,以防止每个地区的枢纽仓库出现库存短缺,从而导致长期库存过剩
客户
富士施乐
关于客户
Fuji Xerox 是日本摄影公司 Fujifilm Holdings (75%) 和美国文件管理公司 Xerox (25%) 的合资伙伴关系,旨在开发、生产和销售静电复印和文件相关产品和服务。
解决方案
NEC 实施了一项云服务,可提供全球物流的可视性,并与 GXS Worldwide, Inc. 的一套服务 GXS 管理服务连接,该服务能够根据 EDI 等国际标准对企业之间的交易进行数据编排,从而将可视性引入客户的全球供应链,并实现对全球产品分销的有效跟踪。软件组件 - GXS 托管服务 - NEC 基于云的多语言解决方案
收集的数据
Asset Status Tracking, Inventory Levels, Logistics Cost, Shipment Verification, Supply Chain Optimization
运营影响
数量效益
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.