下载PDF
实例探究 > Success Story – Frejus Tunnel

Success Story – Frejus Tunnel

技术
  • 功能应用 - 计算机化维护管理系统 (CMMS)
  • 功能应用 - 企业资产管理系统 (EAM)
  • 功能应用 - 远程监控系统
适用行业
  • 建筑与基础设施
  • 运输
适用功能
  • 设施管理
  • 维护
用例
  • 资产健康管理 (AHM)
  • 楼宇自动化与控制
  • 预测性维护
  • 远程资产管理
服务
  • 软件设计与工程服务
  • 系统集成
挑战
In 2014, GEF realized that they were handling too many separate sets of equipment while managing the Frejus Tunnel, partially due to safety measures implemented since 2000. In addition to systems for ventilation and multiple forms of signage and lighting, they also had to track the data output from, and the maintenance of, 241 video cameras, complex fire detection and suppression systems, and thermal gates at each entrance. Safety concerns also led to the construction of a new rescue tunnel in 2007. While TECNOSITAF had their own software to manage the input from these systems and to respond to emergencies, some of their maintenance systems were outdated. For instance, what few CAD drawings they had of the tunnel dated back to the tunnel’s construction in 1980; they did not have a clear maintenance history for their assets, and they managed work orders through an Excel spreadsheet. While the tunnel was being maintained effectively, GEF and TECNOSITAF decided that it needed to be maintained more efficiently as well, and turned to ARCHIBUS.
关于客户
Frejus Tunnel is the ninth longest road tunnel in the world and is one of the major trans-Alpine links between France and Italy. Approximately 2.7 million people live on either side of the tunnel in Savoie, France and the Province of Turin, Italy, with another 1.36 million in the nearby city of Milan. More than 1 million cars have used the tunnel every year since it opened in 1980, and the number is steadily increasing. The tunnel is a complex operation involving ventilation, traffic monitoring, fire prevention, and emergency response systems. To further complicate matters, while the tunnel is maintained by the Groupment d’Exploitation du Frejus (GEF), the day to day management is handled by concessionarie companies, SFTRF on the French side and TECNOSITAF, a subsidiary of SITAF, on the Italian side.
解决方案
Having identified these tunnel maintenance issues, TECNOSITAF began working with ARCHIBUS to integrate and update their maintenance systems in 2014. The first step in the process was to gather and update the relevant data about the tunnel assets and systems. This involved updating and creating new CAD drawings and recording asset information for over 4,300 pieces of equipment over 13 kilometers of tunnel, 5 buildings, and 26,000 square meters of platform space. By the fall of 2014, TECNOSITAF was ready to integrate this new data into the ARCHIBUS Building Operations Management application to modernize their workflow processes. The Excel spreadsheet was abandoned as TECNOSITAF began directing 60 staff members over 5 work teams managing 5 service lines all through one platform. With the On Demand Work application, not only was the day-to-day operation of the tunnel made more efficient, but the work order and maintenance processes were also integrated and simplified. Work orders could now be generated with a click of a button. With the workflow process streamlined, TECNOSITAF turned their attention to asset management. The first step was to integrate asset history with the work order process, so that the craft person assigned to a ticket had access to the maintenance history of the asset, better equipping him to do his job effectively and efficiently. The second step was to begin the transition into preventive maintenance rather than just repairs. This meant that, in 2015, TECNOSITAF focused on implementing equipment monitoring. This not only made it easier to know when a piece of equipment broke, but also realize when equipment was starting to malfunction. And it became possible to increase system efficiency by tracking energy consumption.
运营影响
  • Updated database of equipment and spaces based on AutoCAD integration.
  • Efficient ticketing and tracking process from opening of the ticket to its completion.
  • Integrated maintenance calendar and preventive maintenance process for all equipment.
数量效益
  • 1.726 million cars traveled through the tunnel in an average of 13 minutes in 2015.
  • Managed 4,300 pieces of equipment over 13 kilometers of tunnel.
  • Directed 60 staff members over 5 work teams managing 5 service lines.

相关案例.

联系我们

欢迎与我们交流!

* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

Thank you for your message!
We will contact you soon.