Download PDF
Politecnico of Torino Student Team Uses HyperWorks to Reduce Vehicle Weight and Fuel Consumption in Shell Eco Marathon
Technology Category
- Robots - Autonomous Guided Vehicles (AGV)
- Sensors - Autonomous Driving Sensors
Applicable Industries
- Aerospace
- Automotive
Applicable Functions
- Logistics & Transportation
- Product Research & Development
Use Cases
- Smart Parking
- Vehicle Performance Monitoring
The Challenge
The Shell Eco-marathon (SEM) is a global competition that challenges student teams to design, build, and drive the most energy-efficient car. The team H2politO, a group of students from the Politecnico di Torino, participated in the competition with a hydrogen fuel cell vehicle and a hybrid vehicle. The team aimed to improve their vehicles by reducing frictions and masses to minimize fuel consumption. One of the most critical issues was the wheel rim design. Lighter rims lead to less rotating masses, reducing energy consumption and improving the vehicle's dynamic behavior. The challenge was to optimize the geometry of the wheel rims to determine the ideal structure and mass distribution while considering manufacturing constraints. The team needed to apply sophisticated computer-aided engineering (CAE) tools to support a simulation-driven design process and enable early decision making for further improvements of the vehicles.
About The Customer
The team H2politO is a group of students from the Politecnico di Torino, with diverse backgrounds and profiles from various engineering disciplines. The team is based in the Mechanical and Aerospace Engineering Department (DIMEAS) of Turin’s Politecnico, and led by Prof. Massimiliana Carello. The team’s mission is to shape a new generation of engineers who represent the educational excellence in regard to each of their competencies. The team designs and constructs low-energy consumption vehicles that could become benchmarks for their categories. The team participated in the Shell Eco-marathon Europe with a hydrogen fuel cell vehicle and a hybrid vehicle.
The Solution
The H2politO team applied Altair’s HyperWorks suite to design and optimize the wheel rims. The tools enabled them to consider technical constraints such as tire design specifications and constraints related to the chosen manufacturing technology for the rims. The team used an aluminum alloy for the rims due to its lightness and other beneficial material characteristics. To optimize the rim structure, the students used OptiStruct, Altair’s FE solver and optimization tool. They defined the component’s design space, applied loads and other boundary conditions, and conducted an optimization study that simulated the real test for the rims. The resulting mass distribution provided the basis for a detailed CAD model of the rim. The team used static analyses to validate the results.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.
Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).
Case Study
Aerospace & Defense Case Study Airbus
For the development of its new wide-body aircraft, Airbus needed to ensure quality and consistency across all internal and external stakeholders. Airbus had many challenges including a very aggressive development schedule and the need to ramp up production quickly to satisfy their delivery commitments. The lack of communication extended design time and introduced errors that drove up costs.