Streamlining Development and Automating Processes: First Solar's Journey with Nintex K2 Five
Technology Category
- Functional Applications - Enterprise Resource Planning Systems (ERP)
- Functional Applications - Manufacturing Execution Systems (MES)
Applicable Industries
- Packaging
- Renewable Energy
Applicable Functions
- Procurement
- Product Research & Development
Use Cases
- Additive Manufacturing
- Inventory Management
Services
- System Integration
- Testing & Certification
The Challenge
First Solar, a leading producer of high-performance thin film photovoltaic (PV) modules, was facing challenges in automating and modernizing work across its business. The company was operating in a startup mode, with a significant portion of work being conducted via email or Excel spreadsheets. As the company grew, it realized the need to automate processes to eliminate manual work and enhance operational efficiency. The company initially considered using SharePoint’s built-in workflow tools, but this did not provide a single platform to manage all the different workflows. Another challenge was the complexity of the company's change management process, which was managed by a 21-tab Excel spreadsheet. This manual and time-consuming process needed an upgrade. Additionally, the company needed to centralize and streamline document management, but purchasing enterprise document management systems for every department could have been extremely costly.
About The Customer
First Solar is a U.S.-based company that produces high-performance thin film photovoltaic (PV) modules, designed and developed at its R&D centers in California and Ohio. The company has a manufacturing footprint that spans the United States, Malaysia, and Vietnam, making it the only U.S.-headquartered company among the world’s largest solar manufacturers. Efficiency is a key focus for First Solar, not just in terms of its products, but also in its internal operations. The company is committed to innovating solutions across the organization to improve employee efficiency and simplify its technology landscape.
The Solution
First Solar implemented the K2 Five process automation platform from Nintex to centralize support and build workflows as per their needs. The company has deployed about 30 applications, ranging from an intricate change management system to the company’s document control center. The K2 Five platform is recognized across the organization as a tool that delivers business solutions. The K2 Five change management system replaced the complex Excel spreadsheet, orchestrating a gating process that evaluates the risk and complexity of any given change. It goes through an initial rule-based workflow that scores a form based on how it was filled out. Once the form has been signed off by management, it triggers a stage to determine how many different workflow approvals will be needed. First Solar also developed an enterprise document management system, leveraging SharePoint for document storage and K2 Five to manage approvals. The system has the intelligence to figure out which library a document belongs in and who needs to sign off and approve the document.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Remote Monitoring & Predictive Maintenance App for a Solar Energy System
The maintenance & tracking of various modules was an overhead for the customer due to the huge labor costs involved. Being an advanced solar solutions provider, they wanted to ensure early detection of issues and provide the best-in-class customer experience. Hence they wanted to automate the whole process.
Case Study
Vestas: Turning Climate into Capital with Big Data
Making wind a reliable source of energy depends greatly on the placement of the wind turbines used to produce electricity. Turbulence is a significant factor as it strains turbine components, making them more likely to fail. Vestas wanted to pinpoint the optimal location for wind turbines to maximize power generation and reduce energy costs.
Case Study
Siemens Wind Power
Wind provides clean, renewable energy. The core concept is simple: wind turbines spin blades to generate power. However, today's systems are anything but simple. Modern wind turbines have blades that sweep a 120 meter circle, cost more than 1 million dollars and generate multiple megawatts of power. Each turbine may include up to 1,000 sensors and actuators – integrating strain gages, bearing monitors and power conditioning technology. The turbine can control blade speed and power generation by altering the blade pitch and power extraction. Controlling the turbine is a sophisticated job requiring many cooperating processors closing high-speed loops and implementing intelligent monitoring and optimization algorithms. But the real challenge is integrating these turbines so that they work together. A wind farm may include hundreds of turbines. They are often installed in difficult-to-access locations at sea. The farm must implement a fundamentally and truly distributed control system. Like all power systems, the goal of the farm is to match generation to load. A farm with hundreds of turbines must optimize that load by balancing the loading and generation across a wide geography. Wind, of course, is dynamic. Almost every picture of a wind farm shows a calm sea and a setting sun. But things get challenging when a storm goes through the wind farm. In a storm, the control system must decide how to take energy out of gusts to generate constant power. It must intelligently balance load across many turbines. And a critical consideration is the loading and potential damage to a half-billion-dollar installed asset. This is no environment for a slow or undependable control system. Reliability and performance are crucial.
Case Study
Remote Monitoring and Control for a Windmill Generator
As concerns over global warming continue to grow, green technologies are becoming increasingly popular. Wind turbine companies provide an excellent alternative to burning fossil fuels by harnessing kinetic energy from the wind and converting it into electricity. A typical wind farm may include over 80 wind turbines so efficient and reliable networks to manage and control these installations are imperative. Each wind turbine includes a generator and a variety of serial components such as a water cooler, high voltage transformer, ultrasonic wind sensors, yaw gear, blade bearing, pitch cylinder, and hub controller. All of these components are controlled by a PLC and communicate with the ground host. Due to the total integration of these devices into an Ethernet network, one of our customers in the wind turbine industry needed a serial-to-Ethernet solution that can operate reliably for years without interruption.
Case Study
Temperature monitoring for vaccine fridges
Dulas wanted a way to improve the reliability of the cold chain, facilitating maintenance and ensuring fewer vaccines are spoiled. Dulas wanted an M2M solution which would enable them to record and report the temperature inside vaccine refrigerators.
Case Study
IoT Data Analytics Case Study - Packaging Films Manufacturer
The company manufactures packaging films on made to order or configure to order basis. Every order has a different set of requirements from the product characteristics perspective and hence requires machine’s settings to be adjusted accordingly. If the film quality does not meet the required standards, the degraded quality impacts customer delivery causes customer dissatisfaction and results in lower margins. The biggest challenge was to identify the real root cause and devise a remedy for that.