下载PDF
Applied Technical Services Streamlines Document Management with Digital Workflow
技术
- 应用基础设施与中间件 - 数据库管理和存储
- 基础设施即服务 (IaaS) - 云存储服务
适用行业
- 航天
- 汽车
适用功能
- 维护
- 质量保证
用例
- 实验自动化
- 库存管理
服务
- 系统集成
- 测试与认证
挑战
随着高达 20% 的年增长率和数千个活跃项目,该公司的信息管理方法不再满足其需求。部门间信息存储碎片化、不一致。缺乏清晰、一致的流程和数据工作流程阻碍了运营效率。 ATS 想要彻底改造其遗留的内部门户,为每个部门构建一个主页,并在系统内集中存储文档,并创建一个客户门户。为了实现这些,他们需要找到一种更直观、自动化的解决方案。
客户
应用技术服务 (ATS)
关于客户
Applied Technical Services (ATS)是北美领先的测试、检验和咨询工程公司之一。 ATS 公司总部位于乔治亚州玛丽埃塔,拥有 28 个卫星办事处和约 700 名员工,为汽车、航空航天、核能以及纸浆和造纸等多个行业提供专家服务。
解决方案
通过使用 Nintex Advanced Workflow 和 Modern Forms,ATS 与 Abel Solutions 合作创建了一个更高效、更统一的系统。他们实现了整个企业的文档、表格和数据记录标准化,包括项目、工作、潜在客户和客户记录的工作流自动化。
运营影响
数量效益
相关案例.
Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.
Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).
Case Study
Aerospace & Defense Case Study Airbus
For the development of its new wide-body aircraft, Airbus needed to ensure quality and consistency across all internal and external stakeholders. Airbus had many challenges including a very aggressive development schedule and the need to ramp up production quickly to satisfy their delivery commitments. The lack of communication extended design time and introduced errors that drove up costs.