下载PDF
Autoscaling Production Application Security in Betterment’s CI/CD Pipeline
技术
- 应用基础设施与中间件 - 事件驱动型应用
- 网络安全和隐私 - 应用安全
适用行业
- 国家安全与国防
- 石油和天然气
用例
- 供应链可见性(SCV)
- 篡改检测
服务
- 系统集成
挑战
Betterment 需要一种解决方案来自动扩展和阻止攻击,而不需要持续的签名调整或影响性能。
关于客户
Betterment 是一家在线财务顾问,管理着超过 140 亿美元的资产,为超过 380,000 名客户提供服务。
解决方案
Betterment 采用 Signal Sciences 来自动化部署和更新,并在不影响性能的情况下快速获取明智的见解。
运营影响
数量效益
相关案例.
Case Study
Taking Oil and Gas Exploration to the Next Level
DownUnder GeoSolutions (DUG) wanted to increase computing performance by 5 to 10 times to improve seismic processing. The solution must build on current architecture software investments without sacrificing existing software and scale computing without scaling IT infrastructure costs.
Case Study
Remote Wellhead Monitoring
Each wellhead was equipped with various sensors and meters that needed to be monitored and controlled from a central HMI, often miles away from the assets in the field. Redundant solar and wind generators were installed at each wellhead to support the electrical needs of the pumpstations, temperature meters, cameras, and cellular modules. In addition to asset management and remote control capabilities, data logging for remote surveillance and alarm notifications was a key demand from the customer. Terra Ferma’s solution needed to be power efficient, reliable, and capable of supporting high-bandwidth data-feeds. They needed a multi-link cellular connection to a central server that sustained reliable and redundant monitoring and control of flow meters, temperature sensors, power supply, and event-logging; including video and image files. This open-standard network needed to interface with the existing SCADA and proprietary network management software.
Case Study
Refinery Saves Over $700,000 with Smart Wireless
One of the largest petroleum refineries in the world is equipped to refine various types of crude oil and manufacture various grades of fuel from motor gasoline to Aviation Turbine Fuel. Due to wear and tear, eight hydrogen valves in each refinery were leaking, and each cost $1800 per ton of hydrogen vented. The plant also had leakage on nearly 30 flare control hydrocarbon valves. The refinery wanted a continuous, online monitoring system that could catch leaks early, minimize hydrogen and hydrocarbon production losses, and improve safety for maintenance.