实例探究 > ICA Group Quick and Efficient Retrofit Project

ICA Group Quick and Efficient Retrofit Project

技术
  • 功能应用 - 仓库管理系统 (WMS)
  • 自动化与控制 - 自动化与过程控制系统
适用行业
  • 零售
  • 食品与饮料
适用功能
  • 仓库和库存管理
  • 物流运输
用例
  • 仓库自动化
  • 库存管理
挑战
The old cranes in ICA's central warehouse were 25 years old and needed to be replaced quickly during the off-peak season without affecting delivery service to stores. The challenge was to replace the old cranes and put the new cranes in operation in seven weeks. ICA sent an inquiry to four players and chose Swisslog due to their good relations and proven track record in the Nordic region. The project was planned, designed, and procured about a year before the actual replacement took place, involving a team of five to six people working full-time and another 25 people involved in different aspects of the work.
关于客户
ICA Group is Sweden’s largest grocery retailer and one of the country’s largest companies, with operations in pharmacy, banking, and real estate activities. The core of ICA Group’s operation is the retail grocery trade, carried out in 2,300 stores in Sweden and the Baltic countries. ICA has set high targets for continued strong growth, profitability, and sustainability. Effective logistics and warehousing operations are prioritized activities in conjunction with the ongoing work to modernize and streamline ICA’s logistics network.
解决方案
Swisslog was chosen to replace the six worn-out stacker cranes in ICA's central warehouse. The project was carried out according to plan, with the replacement starting at the end of June and the first cranes in place by early July. All six cranes were in operation before the end date of the stringent time plan. The new six High Bay cranes are of the type Vectura S32. The replacement was an emergency measure to ensure the operation of the facility and avoid shutdowns. The facility’s track system, also 25 years old, will eventually need to be replaced to obtain conditions for greatly increased productivity and efficiency in the automated High Bay Warehouse.
运营影响
  • Fast and smooth replacement of old stacker cranes.
  • Replacement did not affect the normal operation and service.
  • The project was carried out totally according to plan.
数量效益
  • Replaced six old stacker cranes with new Vectura S32 cranes in seven weeks.

相关案例.

联系我们

欢迎与我们交流!

* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

Thank you for your message!
We will contact you soon.