下载PDF
实例探究 > Korea’s SK E&C Reduces Engineering Estimating Man-Hours by 50% With Aspen Capital Cost Estimator

Korea’s SK E&C Reduces Engineering Estimating Man-Hours by 50% With Aspen Capital Cost Estimator

技术
  • 应用基础设施与中间件 - 数据交换与集成
适用行业
  • 建筑与基础设施
  • 石油和天然气
适用功能
  • 离散制造
  • 采购
用例
  • 自动化制造系统
  • 预测性维护
服务
  • 软件设计与工程服务
挑战
SK E&C, a global EPC and Total Solution Supplier, was facing fierce competition in bidding and estimating capital construction projects. The company needed a technology and workflow process that would allow them to compete against low-labor-cost competitors. The main challenges were improving target accuracy, maintaining sufficient data for a Class IV estimate, and optimizing bids as time was spent developing the estimates rather than refining them. The company also needed to counter global threats to their business with technology that would enhance efficiency and develop bids that were more accurate, flexible, and reflective of historical cost data.
关于客户
SK E&C is a renowned global EPC and Total Solution Supplier. Since its establishment in 1977, the firm has been transforming itself and expanding its services and solutions beyond its core upstream, midstream, and refining business. The company has a unique perspective on what the owner-operator seeks to obtain from a bid, including scenario analysis, understanding of financial planning, a cooperative engagement with EPC contractors, and a thorough cost comparison leveraging alternative designs. This perspective has helped SK E&C become a successful global company. The company was the first to enter the LNG business in the United States and the oil sands business in Canada. It has continuously expanded into the global market in Asia and the Middle East with projects such as Turkey’s Eurasia Underwater Tunnel and the Laos hydroelectric power project.
解决方案
SK E&C chose Aspen Capital Cost Estimator (ACCE) as the integrated estimating tool. The company defined a path for deployment that was methodical and produced bids in a systematic manner. Bid accuracy was improved through the calibration of the unit-rate estimate with SK historical data. Modular construction became an option because the unit-rate estimate format could be leveraged. A six-step workflow was established for conceptual estimates using ACCE. The workflow prepared an estimate plan, executed the estimate, and then benchmarked and indexed against prior historical estimates to sharpen and adjust cost, thereby improving accuracy.
运营影响
  • SK E&C was able to easily optimize the capital cost by selecting the best options and making the right decision.
  • The company reduced wasted engineering and functional man-hours.
  • SK E&C was able to start a bid with minimal scope definition.
数量效益
  • SK E&C reduced waste in engineering and functional man-hours to shorten estimate preparation time by 50%.
  • The company also improved accuracy by 50%.

相关案例.

联系我们

欢迎与我们交流!

* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

Thank you for your message!
We will contact you soon.