下载PDF
KOZ Architects' Transition to 3D Design with Archicad: A Case Study
技术
- 机器人 - 协作机器人
- 传感器 - 环境传感器
适用行业
- 建筑物
- 玻璃
适用功能
- 产品研发
用例
- 实验自动化
- 虚拟原型与产品测试
服务
- 培训
挑战
Koz Architects 需要一种支持协作工作和 3D 建模的工具,以便有效地沟通他们的项目。
关于客户
Koz Architects 是一家成立于 1999 年的建筑公司,专注于开发富有表现力和欢快的建筑。他们赢得了无数的竞赛和投标,拥有一支由 13 名成员组成的团队。
解决方案
他们选择使用 3D 设计软件 Archicad 来满足协作工作和 3D 建模的需求。
运营影响
数量效益
相关案例.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
Intelligent Building Automation System and Energy Saving Solution
One of the most difficult problems facing the world is conserving energy in buildings. However, it is not easy to have a cost-effective solution to reduce energy usage in a building. One solution for saving energy is to implement an intelligent building automation system (BAS) which can be controlled according to its schedule. In Indonesia a large university with a five floor building and 22 classrooms wanted to save the amount of energy being used.
Case Study
Powering Smart Home Automation solutions with IoT for Energy conservation
Many industry leaders that offer Smart Energy Management products & solutions face challenges including:How to build a scalable platform that can automatically scale-up to on-board ‘n’ number of Smart home devicesData security, solution availability, and reliability are the other critical factors to deal withHow to create a robust common IoT platform that handles any kind of smart devicesHow to enable data management capabilities that would help in intelligent decision-making
Case Study
Commercial Building Automation Boosts Energy Efficiency
One of the challenges to building automation is the multitude of non-interoperable communications protocols that have evolved over the years. Buildings have several islands of automation. Bridging the islands of different automation without losing the considerable investment in each specialized control network is the main focus in this solution.
Case Study
Protecting a Stadium from Hazardous Materials Using IoT2cell's Mobility Platform
There was a need for higher security at the AT&T Stadium during the NFL draft. There was a need to ensure that nuclear radiation material was not smuggled inside the stadium. Hazmat materials could often be missed in a standard checkpoint when gaining entry into a stadium.