下载PDF
实例探究 > Optimising waste collection using OS MasterMap® Integrated Transport Network™ Layer

Optimising waste collection using OS MasterMap® Integrated Transport Network™ Layer

技术
  • 分析与建模 - 预测分析
  • 功能应用 - 车队管理系统 (FMS)
  • 网络与连接 - 网络管理和分析软件
适用行业
  • 城市与自治市
  • 回收与废物管理
适用功能
  • 设施管理
  • 物流运输
用例
  • 车队管理
服务
  • 软件设计与工程服务
  • 系统集成
挑战
Under the European Union Waste Management Directive, by 2010 the UK was required to reduce the amount of waste going to landfill to 75% of that produced in 1995. Waste management is the third largest area of local government expenditure after construction and adult social care, prompting councils to improve the efficiency of waste collection services. Additionally, strong housing and population growth in areas like Northamptonshire has resulted in significant additional demand for services. The Northamptonshire Waste Partnership (NWP) aimed to address these challenges by optimizing waste collection routes and improving existing recycling services.
关于客户
Daventry District Council is a local government authority in the United Kingdom, part of the Northamptonshire Waste Partnership (NWP). The NWP includes Northamptonshire County Council and seven district and borough councils, working together to achieve the Northamptonshire Joint Waste Management Strategy. Daventry District Council volunteered as the project manager for a county-wide program aimed at optimizing waste collection and recycling services. The council has been experiencing steady population growth, with an additional 20,000 inhabitants expected over the next 10 years. The council's efforts are part of a broader initiative to meet the European Union Waste Management Directive and improve the efficiency of waste management services.
解决方案
The project, managed by White Young Green, was divided into four stages: generating new waste collection routes, investigating cross-border working benefits, evaluating joint working opportunities, and assessing county-wide working potential. Integrated Skills, a specialist in environmental advisory and management services, was contracted to optimize refuse collection routing using RouteSmart and OS MasterMap Integrated Transport Network (ITN) Layer with Road Routing Information (RRI). The solution involved creating new waste collection routes, reducing the number of routes, and optimizing vehicle and resource usage. The ITN Layer provided detailed road routing and drive information, including width, height, and weight restrictions, which were crucial for accurate route planning.
运营影响
  • The project led to reduced mileage, resulting in fuel savings and a reduced carbon footprint.
  • The number of waste collection routes within the authority was reduced, leading to increased efficiency.
  • The solution helped evaluate the impact of different disposal locations and compare various collection methodologies.
数量效益
  • Daventry District Council achieved savings of around £100,000 per year.
  • Wellingborough saw mileage savings of around 10% through route rebalancing.
  • Corby identified spare capacity of three vehicle days, enough to serve over 4,000 new properties.

相关案例.

联系我们

欢迎与我们交流!

* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

Thank you for your message!
We will contact you soon.