Technip, a world leader in project management, engineering, and construction for the energy industry, faced challenges in optimizing the design of its installations to meet the needs of the oil and gas giants. The company was using manual methods for equation data production and entry into Excel, which led to many errors. The company also needed to adapt quickly to the many developments in calculation over the past 20 years. The design office needed a solution that could provide high transparency and perfect legibility for all operations carried out, which was not possible with Excel.
关于客户
Technip is a contractor in the field of oil services, selling turnkey projects to clients in the oil and gas industry. With bases in 48 countries worldwide, Technip possesses cutting edge industrial infrastructures and a fleet of vessels specialized in the installation of pipelines and underwater construction. From the deepest subsea developments to the most extensive and complex offshore and onshore infrastructures, the 36,500 employees of Technip propose the best solutions and most innovative technologies to address the global energy challenge. The engineering company constructs subsea worksites, designs and supplies piping networks, and sells fixed or rigid pipelines to companies with onshore and offshore needs.
解决方案
Technip equipped itself with PTC Mathcad, a technical calculations software developed by PTC. The software reduced operations to a minimum by automating the analytical calculation process. It also enabled Technip to adapt far more quickly to the many developments in calculation over the past 20 years. PTC Mathcad offers the advantage of providing high transparency and perfect legibility for all operations carried out. The software's presentation capacities made it possible to obtain a high degree of calculation transparency and therefore enabled simple and efficient verification. The software also proved highly useful in terms of a log in the event of auditing, particularly in the area of quality control.
运营影响
数量效益
相关案例.
Case Study
Taking Oil and Gas Exploration to the Next Level
DownUnder GeoSolutions (DUG) wanted to increase computing performance by 5 to 10 times to improve seismic processing. The solution must build on current architecture software investments without sacrificing existing software and scale computing without scaling IT infrastructure costs.
Case Study
Remote Wellhead Monitoring
Each wellhead was equipped with various sensors and meters that needed to be monitored and controlled from a central HMI, often miles away from the assets in the field. Redundant solar and wind generators were installed at each wellhead to support the electrical needs of the pumpstations, temperature meters, cameras, and cellular modules. In addition to asset management and remote control capabilities, data logging for remote surveillance and alarm notifications was a key demand from the customer. Terra Ferma’s solution needed to be power efficient, reliable, and capable of supporting high-bandwidth data-feeds. They needed a multi-link cellular connection to a central server that sustained reliable and redundant monitoring and control of flow meters, temperature sensors, power supply, and event-logging; including video and image files. This open-standard network needed to interface with the existing SCADA and proprietary network management software.
Case Study
Refinery Saves Over $700,000 with Smart Wireless
One of the largest petroleum refineries in the world is equipped to refine various types of crude oil and manufacture various grades of fuel from motor gasoline to Aviation Turbine Fuel. Due to wear and tear, eight hydrogen valves in each refinery were leaking, and each cost $1800 per ton of hydrogen vented. The plant also had leakage on nearly 30 flare control hydrocarbon valves. The refinery wanted a continuous, online monitoring system that could catch leaks early, minimize hydrogen and hydrocarbon production losses, and improve safety for maintenance.