实例探究 > ThyssenKrupp Elevator Americas Reduces Product Costs with aPriori

ThyssenKrupp Elevator Americas Reduces Product Costs with aPriori

技术
  • 分析与建模 - 预测分析
  • 功能应用 - 产品生命周期管理系统 (PLM)
适用功能
  • 采购
  • 产品研发
用例
  • 自动化制造系统
  • 预测性维护
服务
  • 软件设计与工程服务
  • 系统集成
挑战
ThyssenKrupp Elevator faced challenges in cost management, particularly at the design stage. The process was manual, time-consuming, and inconsistent, leading to delays and inefficiencies. Design engineers focused on product quality, with cost considerations being secondary. The company needed a solution to integrate cost management into the design process without slowing down product development.
关于客户
ThyssenKrupp Elevator is a leading global elevator company, part of the ThyssenKrupp Group based in Essen, Germany. The company offers a wide range of products including passenger and freight elevators, escalators, and moving walks. With annual sales of 42.6 billion euros and over 177,000 employees globally, ThyssenKrupp Elevator Americas is the largest producer of elevators in the Americas, employing over 13,500 people and generating sales of more than $2.7 billion. The company operates extensively in the United States, Canada, Central, and South America, with significant manufacturing operations in Tennessee.
解决方案
ThyssenKrupp Elevator implemented aPriori, a product cost-management software, to address its cost management challenges. A cross-functional team evaluated the software over 10 weeks, focusing on its ability to provide real-time product-cost information. The team found that aPriori could identify cost savings even in mature product parts and was easy to use for both new and experienced engineers. The software allowed for instant and precise cost assessments from CAD models, enabling more informed design decisions. aPriori was also used by the manufacturing and procurement teams to optimize processes and negotiate better supplier terms.
运营影响
  • The design team can now evaluate and cost three times more design alternatives, facilitating product innovation and cost savings.
  • Design engineers can create detailed cost estimates within an hour, significantly reducing time to market.
  • The procurement team uses aPriori for fact-based negotiations, leading to cost savings on sourced goods.
数量效益
  • Design engineers can now create cost estimates within one hour, compared to a week previously.
  • ThyssenKrupp Elevator has reduced the cost of sourced goods through more effective procurement negotiations.

相关案例.

联系我们

欢迎与我们交流!

* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

Thank you for your message!
We will contact you soon.