Download PDF
Cloud HPC Simulation Enables Boom’s Supersonic Passenger Jet to Take Off
Technology Category
- Infrastructure as a Service (IaaS) - Cloud Computing
Applicable Industries
- Aerospace
Applicable Functions
- Product Research & Development
Use Cases
- Digital Twin
- Predictive Quality Analytics
Services
- Cloud Planning, Design & Implementation Services
- Software Design & Engineering Services
The Challenge
Boom Supersonic, an aerospace startup, is designing a supersonic passenger jet that will revolutionize business travel. However, creating a technological breakthrough in the aerospace sector traditionally requires billions of dollars in R&D, a large engineering staff, extensive wind tunnel testing, and many years of development. Advanced fluid-flow and mechanical stress simulation tools have reduced physical testing requirements and costs, but they require costly dedicated high performance computing (HPC) resources to be effective. As a small startup with limited funding but outsized dreams, Boom turned to the public cloud because the upfront costs of building their own on-premise HPC cluster were cost-prohibitive.
About The Customer
Boom Supersonic is an aerospace startup that is redefining passenger air travel. They are designing a supersonic passenger jet that will take business travelers from San Francisco to Tokyo in 5.5 hours, revolutionizing business travel and revitalizing a long stagnant industry. Only a few years old, they are already backed by significant funding and have secured over 75 advance orders from airlines around the world. Boom’s innovation comes more than 40 years after the introduction of the Concorde, an engineering marvel but an economic disappointment. Many years later, using cutting-edge simulation combined with cloud technology, Boom is setting out to accomplish what Concorde could not: a sustainable business model.
The Solution
Boom has run all their simulations on Rescale’s enterprise big compute platform since day one. Rescale offers Boom virtually unlimited compute capacity, while allowing them to bypass investment in internal IT capability—both incredibly valuable to an early stage startup with limited funding. Rescale provides a turnkey interface between advanced engineering software and HPC hardware in the public cloud, allowing Boom to focus on their core engineering competency without distraction from IT management tasks. In addition to allowing Boom to forego in-house IT, Rescale further vastly simplifies IT management with the ScaleX Enterprise administration portal, which allows Boom to manage costs with budgets for projects and teams, manage teams with custom permissions for hardware and software, and manage security with features such as multi-factor authentication and single sign-on.
Operational Impact
Quantitative Benefit
Related Case Studies.
Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.
Case Study
Aerospace & Defense Case Study Airbus
For the development of its new wide-body aircraft, Airbus needed to ensure quality and consistency across all internal and external stakeholders. Airbus had many challenges including a very aggressive development schedule and the need to ramp up production quickly to satisfy their delivery commitments. The lack of communication extended design time and introduced errors that drove up costs.
Case Study
Developing Smart Tools for the Airbus Factory
Manufacturing and assembly of aircraft, which involves tens of thousands of steps that must be followed by the operators, and a single mistake in the process could cost hundreds of thousands of dollars to fix, makes the room for error very small.
Case Study
Accelerate Production for Spirit AeroSystems
The manufacture and assembly of massive fuselage assemblies and other large structures generates a river of data. In fact, the bill of materials for a single fuselage alone can be millions of rows of data. In-house production processes and testing, as well as other manufacturers and customers created data flows that overwhelmed previous processes and information systems. Spirit’s customer base had grown substantially since their 2005 divestiture from Boeing, resulting in a $41 billion backlog of orders to fill. To address this backlog, meet increased customer demands and minimize additional capital investment, the company needed a way to improve throughput in the existing operational footprint. Spirit had a requirement from customers to increase fuselage production by 30%. To accomplish this goal, Spirit needed real-time information on its value chain and workflow. However, the two terabytes of data being pulled from their SAP ECC was unmanageable and overloaded their business warehouse. It had become time-consuming and difficult to pull aggregate data, disaggregate it for the needed information and then reassemble to create a report. During the 6-8 hours it took to build a report, another work shift (they run three per day) would have already taken place, thus the report content was out-of-date before it was ever delivered. As a result, supervisors often had to rely on manual efforts to provide charts, reports and analysis.