下载PDF
SpaceQuest's Transformation with Altium Designer: A Leap into Advanced Satellite Technology
技术
- 网络与连接 - 全球导航卫星系统 (GNSS)
- 传感器 - 全球定位系统
适用行业
- 航天
- 电信
适用功能
- 产品研发
- 质量保证
用例
- 时间敏感网络
- 虚拟原型与产品测试
服务
- 硬件设计与工程服务
- 系统集成
挑战
SpaceQuest 是一家卫星技术公司,在开发用于近地轨道资产跟踪和管理服务的微型卫星时,他们的复杂设计需要更高效的 PCB 布局解决方案。他们还想从太空收集 AIS 信号。
关于客户
SpaceQuest 是一家卫星技术公司,总部位于弗吉尼亚州费尔法克斯。二十多年来,他们一直在为政府、大学和商业用途开发先进的卫星技术。他们是卫星自动识别系统(AIS)市场公认的领导者,并参与了多个太空开发项目。
解决方案
SpaceQuest 采用 PCB 设计软件 Altium Designer 来简化他们的设计挑战。 Altium Designer 使他们能够将所有电路板原理图整合到一个环境中,进行电气完整性、布线和机械配合检查,并在短短六周内开发出从概念到飞行硬件的实验性 AIS 收集有效负载。
运营影响
数量效益
相关案例.
Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.
Case Study
Aerospace & Defense Case Study Airbus
For the development of its new wide-body aircraft, Airbus needed to ensure quality and consistency across all internal and external stakeholders. Airbus had many challenges including a very aggressive development schedule and the need to ramp up production quickly to satisfy their delivery commitments. The lack of communication extended design time and introduced errors that drove up costs.
Case Study
Developing Smart Tools for the Airbus Factory
Manufacturing and assembly of aircraft, which involves tens of thousands of steps that must be followed by the operators, and a single mistake in the process could cost hundreds of thousands of dollars to fix, makes the room for error very small.
Case Study
Accelerate Production for Spirit AeroSystems
The manufacture and assembly of massive fuselage assemblies and other large structures generates a river of data. In fact, the bill of materials for a single fuselage alone can be millions of rows of data. In-house production processes and testing, as well as other manufacturers and customers created data flows that overwhelmed previous processes and information systems. Spirit’s customer base had grown substantially since their 2005 divestiture from Boeing, resulting in a $41 billion backlog of orders to fill. To address this backlog, meet increased customer demands and minimize additional capital investment, the company needed a way to improve throughput in the existing operational footprint. Spirit had a requirement from customers to increase fuselage production by 30%. To accomplish this goal, Spirit needed real-time information on its value chain and workflow. However, the two terabytes of data being pulled from their SAP ECC was unmanageable and overloaded their business warehouse. It had become time-consuming and difficult to pull aggregate data, disaggregate it for the needed information and then reassemble to create a report. During the 6-8 hours it took to build a report, another work shift (they run three per day) would have already taken place, thus the report content was out-of-date before it was ever delivered. As a result, supervisors often had to rely on manual efforts to provide charts, reports and analysis.