下载PDF
Dynamic Optimization of Inventory Management in Aerospace Manufacturing
技术
- 应用基础设施与中间件 - 事件驱动型应用
- 功能应用 - 库存管理系统
适用行业
- 航天
适用功能
- 物流运输
- 仓库和库存管理
用例
- 库存管理
- 拣选/分拣/定位
挑战
一家飞机发动机、航空电子设备和其他航空产品的全球制造商拥有 90 条主要产品线,这些产品线各不相同,需要来自全球数百家制造商的数万个零件。
供应链的复杂性以及维护库存的成本非常高。仅就其飞机发动机的两个组件而言,该公司拥有来自数百家供应商的 6 亿美元的零部件库存,其中包括 4 亿美元的快速流动库存。优化库存水平可以减少供应商延迟并提高毛利率和收入。
客户
未披露
关于客户
飞机发动机、航空电子设备和其他航空产品的全球制造商
解决方案
作为推动优化运营和投资软件的一部分,该公司对 C3 AI 库存优化应用程序进行了试用。通过应用人工智能来构建库存水平和供应商风险的实时视图,该公司降低了库存水平,同时仍保持甚至提高了服务水平。
经过 10 周的试用后,该公司展示了库存持有成本的显着节省,并准确预测了供应商的延误。
运营影响
数量效益
相关案例.
Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.
Case Study
Aerospace & Defense Case Study Airbus
For the development of its new wide-body aircraft, Airbus needed to ensure quality and consistency across all internal and external stakeholders. Airbus had many challenges including a very aggressive development schedule and the need to ramp up production quickly to satisfy their delivery commitments. The lack of communication extended design time and introduced errors that drove up costs.
Case Study
Developing Smart Tools for the Airbus Factory
Manufacturing and assembly of aircraft, which involves tens of thousands of steps that must be followed by the operators, and a single mistake in the process could cost hundreds of thousands of dollars to fix, makes the room for error very small.
Case Study
Accelerate Production for Spirit AeroSystems
The manufacture and assembly of massive fuselage assemblies and other large structures generates a river of data. In fact, the bill of materials for a single fuselage alone can be millions of rows of data. In-house production processes and testing, as well as other manufacturers and customers created data flows that overwhelmed previous processes and information systems. Spirit’s customer base had grown substantially since their 2005 divestiture from Boeing, resulting in a $41 billion backlog of orders to fill. To address this backlog, meet increased customer demands and minimize additional capital investment, the company needed a way to improve throughput in the existing operational footprint. Spirit had a requirement from customers to increase fuselage production by 30%. To accomplish this goal, Spirit needed real-time information on its value chain and workflow. However, the two terabytes of data being pulled from their SAP ECC was unmanageable and overloaded their business warehouse. It had become time-consuming and difficult to pull aggregate data, disaggregate it for the needed information and then reassemble to create a report. During the 6-8 hours it took to build a report, another work shift (they run three per day) would have already taken place, thus the report content was out-of-date before it was ever delivered. As a result, supervisors often had to rely on manual efforts to provide charts, reports and analysis.